Establisment of Triangulation Network
The implementation of the Project’s Reference System is carried out by the Project’s Trigonometric and Altimetric Network, which are basic and necessary tools for monitoring the surveying works. Its implementation, which is an “obligation” of the project owner, is the backbone of the project at all stages of construction.
- Establishment of a Trigonometric Network
- Establishment of a Trigonometric Network
- Definition of Reference System
- High Accuracy Altimetric Network
- Calculation of High-Level High-density Grid System
- Installation of a permanent reference station
- Periodic Network Re-measurement
The high quality of the implementation of the control networks will have beneficial consequences both for the smooth flow of the project and for the accuracy with which the individual projects will be constructed and connected to each other. Time and money is saved by avoiding possible discrepancies and inconsistencies between measurements or even implemented parts of the project.
Contact us for a detailed presentation concerning the establishment of a High Accuracy Control Network and the definition of the appropriate Reference System for your project.
Our Projects
Contact us!
It is advisable to have someone with you who knows the property boundaries. It will be useful to have with you old topographic maps and anything related to the property (contracts, building permit plans, expropriation plans, classification deeds, cadastral maps, etc.). In case of a large area, wear comfortable clothes and shoes because we will need to walk the property’s contour to find its boundaries.