IDENTIFICATION STUDY
FEASIBILITY STUDY
TRAFFIC STUDY
DESIGN
- Topographic background compilation
FINAL STUDY-IMPLEMENTATION STUDY
- Compilation of technical and financial tender documents
Horizontography, Profiles, Sections, Diagrams of visibility lengths
3D illustration of road construction model and driving on it.
Invocation Diagrams, Soil Panels, Brucner Diagram
Safety criteria based on OMOE-Y - Initial state recordings (1: 5000) for preliminary study with photogrammetric methods or 1: 500 for final or as constructed (As Built Drawings) with photogrammetric or terrestrial methods
- Engraving of all the characteristic points of the road (axis, sides, slopes, curbs, junctions, technical constructions) with a very large production of points that can reach up to 1000 points of engagement per day! The engraving is done with geodetic GPS receivers of two frequencies real time kinematic. All the above are carried out according to the regulations of the Greek legislation.