Construction experience - Stadiums

Peace and Friendship Stadium - Improvements, 2002-2003

(OLYMPIC WORKS - STADIUMS):

sef3 thumb     sef4 thumb Renovation - interventions to support static and mechanical equipment. Mapping the plates in order to support the Dome of accommodation of the Stadium of Peace and Friendship 2002, for "Terna SA."
• Establishment of trigonometric network and levelling of precision.
• Extremely accurate mapping of the ring perimeter of the roof.
• Checking on the small movements of plates to support the roof sloping 32 columns of the stadium.
• Preparation of detailed drawings at scales 1:200 and 1:20



NEW FOOTBALL STADIUM "C. KARAISKAKIS" 2003-2004:

(OLYMPIC WORKS - COURTS - METAL)


kar2 thumb     kar4 thumb

Composite construction (concrete and reinforcement) of a new football stadium "KARAISKAKIS G." to "INTRAMET SA"

• Surveying - Control Anchors.

• Control placement of columns.

• Guidance to move and settle in real time the basic fourteen 14 red metal towers (37m tall, 43m long and weighing 100t each), which support the roof of the stadium.

• Triangulation Network Establishment 

 

CONSTRUCTION OF OLYMPIC SCHINIAS ROWING CENTRE, 2001:

(OLYMPIC WORKS - COURTS - METAL) 


kopilatodromio thumb     kopilatodromio1 thumb

Earthworks on the Rowing Centre of Schinia for the "TECHNICAL PUBLIC & PRIVATE PROJECTS SA"

• Establishment of polygons’ network

• Engraving excavating

• Calculation of tumors

• Surveys & planning as built drawings 

 

STADIUM EGALEO, 2005:

(COURTS)

aig1 thumb     aig6 thumb

for INTRAMET SA & CHOROTECHNIKI SA

Reconstruction of the south side stadium and fitting steel roof.

• Establishment polygons’ network.

• Engraving lines.

• Monitoring metal construction.

See for all the construction projects that XYZ have been engaged in as primary surveying consultants or that we have provided surveying services